92 Dix St, Dorchester, MA 

Located in the desirable St. Mark's / Greater Ashmont Main St. neighborhood of Dorchester, this luxurious 2-unit condominium building is in an impeccable new restoration of the original Victorian home. Each condo is 1800-2000 sq. ft. This building features a stylish setting and modern amenities all while keeping the original elegance. Lovely landscaped grounds, and 2 off-street deeded parking spaces per unit.

Two luxurious units are available for rent now! Call or email for details.

For more information on this location, please check out: http://www.92dixstreet.com/

 

 

884 Adams St, Dorchester, MA  

All Sold Out!

For more information on this location, please check out: http://www.884adams.com/

 

 

In the Cedar Grove section of Dorchester is a luxurious four-unit condominium development finished in late 2016. This neighborhood is one of the hottest in the whole City of Boston. This small development consists of 4 bi-level units, each with approximately 2100 sq. ft. of space. Two of the condos have 3 bedrooms, 3 bathrooms (2 masters), and the remaining two condos have 2 bedrooms, 2 bathrooms. All four condos will have huge living room/kitchens with top of the range cabinets, appliances, Brazilian hardwood flooring, HVAC, stereo surround sound, 2 panel solid doors, deeded storage in the basement, rear decks, 2 deeded parking spaces per unit, 4 guest spaces and much much more. These units have all recently been sold.

    

145 Stoughton St, Dorchester

Before:   

                       

After:


Recently approved by the Boston Zoning Board of Appeals for 5 luxury condominiums. This existing two-family structure will be gut-rehabbed into one 2-bed/2-bath, 950 sq. ft. flat condominium on the first floor, one 3-bed/2.5-bath, 1650 sq. ft. bi-level condominium. The existing rear barn will be demolished and three 1600 sq. ft. townhouse condominiums, including parking on the first floor, will be built in its place. Construction will begin in the beginning of January 2018, with an anticipated completion date of July 2018. Call or e-mail us for details.